Twin Cities Premier Plumbing logo

Expert Kitchen Remodel Plumbing in Minneapolis, MN

Kitchen remodels run on two plumbing phases: rough-in before the cabinets go in, and finish after the countertops are set. We handle both, coordinate directly with your general contractor, and make sure everything is right before a single wall closes.

Schedule your service call today

We respond quickly — usually the same day.

Request a quote

Honest pricing. On time. Neighbor-first service.

By submitting, you agree that Twin Cities Premier Plumbing may contact you about your request. Message and data rates may apply.

Why Kitchen Remodel Plumbing Can Make or Break Your Timeline

The plumbing phase is the one every general contractor has to schedule around. Get it wrong and you’re rescheduling cabinet installers, waiting on reinspection, or cutting into new drywall to fix a drain that wasn’t sloped properly. Kitchen remodels in Minneapolis involve more than hooking up a new sink: island drains, gas line pressure tests, dishwasher air gaps, and RO system connections all need to happen in the right sequence.

What Our Kitchen Remodel Plumbing Includes

A kitchen remodel plumbing job in Minneapolis is a two-visit scope, and both visits have to go right. Twin Cities Premier Plumbing handles both phases under one flat-rate quote, so you’re not chasing two separate contractors or coordinating the handoff yourself.

Rough-In Plumbing (Phase One)

Before cabinets and walls close. Gas lines require manometer pressure test before any wall is covered.

Finish Plumbing (Phase Two)

After countertops are set. Kitchen goes fully live at end of this visit.

Every job ends with a full leak check under pressure, hot and cold flow confirmed at every fixture, and disposal and dishwasher cycle testing before we leave. You get a fully functional Minneapolis kitchen.

Our Kitchen Remodel Plumbing Work in Minneapolis

What Minneapolis Homeowners Say About Our Plumbing Work

Why Minneapolis Homeowners Choose Twin Cities Premier Plumbing for Their Kitchen Remodel

Onsite Estimate

You approve the flat-rate quote before we schedule rough-in day. No surprises once work begins.

We Coordinate Around Your GC

Rough-in and finish happen on your contractor's timeline. Cabinet installs never wait on plumbing.

Full Scope: Gas Lines Included

CSST gas rough-ins, pot filler lines, and island sink drains — all under one quote.

Licensed, Permitted, Code-Compliant

Every job permitted where required. Your home's resale value and insurance stay protected.

How Our Kitchen Remodel Plumbing Works

01

Onsite Visit

So we can hear your vision and put a plan together to bring it to life.
Direction Arrows
02

Rough-In Day

Water and gas off. Relocate supply/drain lines, run island + pot filler rough-ins, pressure-test everything.
Direction Arrows
03

Cabinet & Countertop Phase

Your GC's phase. We stay available, confirm drain heights, coordinate with cabinet and countertop teams.
Direction Arrows
04

Finish Plumbing Day

Set sink, install faucet with 1/4-turn shutoffs, mount disposal, connect dishwasher air gap, RO + ice maker lines.
Direction Arrows
05

Final Test & Walkthrough

Every fixture run, dishwasher cycled, disposal tested, all connections checked under pressure before we leave.

How Much Does Kitchen Remodel Plumbing Cost in Minneapolis?

Kitchen remodel plumbing costs vary based on how much of the layout changes, how many fixtures are involved, and whether the scope includes gas line work or an island sink rough-in. A finish-only job (sink, faucet, disposal, dishwasher) is a very different scope from a full gut remodel with line relocation and gas work. We provide a detailed flat-rate quote after a quick virtual walkthrough — so you know exactly what the plumbing phase costs before your first contractor appointment. No hourly billing. No price changes once work begins.

WiseTack financing available for larger kitchen remodel plumbing scopes

You May Also Need

Bathroom faucet repaired by Twin Cities Premier Plumbing

Sinks and Faucets

From single-handle kitchen faucets to apron-front sink installations, we set and connect fixtures right the first time.
Copper pipe repair in a Minneapolis basement

Piping and Repiping

Older Minneapolis homes sometimes reveal outdated or corroded supply lines when the kitchen comes apart. We repipe what needs it.
Twin Cities Premier Plumbing plumber talking with a Minneapolis homeowner

General Plumbing Service Work

Got a list of other plumbing items beyond the remodel scope? We knock out repairs, replacements, and odd jobs on the same visit.

Proudly Serving Minneapolis & the Twin Cities West Side

We serve homeowners and businesses across the Minneapolis metro and western suburbs. Click your city for local service details:

Are you in our service area?

Enter your address to see if we cover your home.

Service Area

Service Towns

Don't see your city? Call us: 763-343-9806

Kitchen Remodel Plumbing FAQ

Most kitchen remodel plumbing scopes split into two visits. Rough-in day runs 4 to 8 hours depending on how much line relocation and gas work is involved. Finish day typically runs 3 to 5 hours. The time between visits depends on your GC’s cabinet and countertop schedule, which we work directly around.

Still have questions? Call (763) 343-9806 or contact us online to talk through your project.

Let's Get Your Kitchen Remodel Plumbing Done Right

Schedule your onsite visit today or call for same-day availability.

↑
You call usWe call you